TC1, OVERSIZED Construction Ahead, 120x120cm, Diamond Grade
Size
The CONSTRUCTION AHEAD Sign (TC-1) is used to notify motorists that they will be entering a construction zone. The oversized version is used on roadways with more than two lanes or speed limits of 70km/h or higher.
The CONSTRUCTION AHEAD Sign (TC-1) is used to notify motorists that they will be entering a construction zone. The oversized version is used on roadways with more than two lanes or speed limits of 70km/h or higher.
Specifications for TC1, OVERSIZED Construction Ahead, 120x120cm, Diamond Grade
Substrate | .081Alum or 16gaSteel or 1/2" MDO |
Sheeting | Diamond Grade |